From as far back as Ed Austin's tenure the administrations have KNOWN that the North Bank needed repairs. Its ludicroud to say that no one knew that the decay was not an issue. Spend the 30-50 million needed to fix and repair the pilings now. The riverwalk is too big a draw to have a potentially deadly accident. After all, the entire courthouse parking lot is built on top of the water with the same pilings.