Author Topic: Urban Construction Update - September 2012  (Read 3740 times)

Metro Jacksonville

  • Hero Member
  • *****
  • Posts: 2644
    • MetroJacksonville.com
Urban Construction Update - September 2012
« on: September 28, 2012, 03:00:13 AM »
Urban Construction Update - September 2012



A brief look at the status of various projects under construction in and around Downtown Jacksonville during the month of September 2012.

Full Article
http://www.metrojacksonville.com/article/2012-sep-urban-construction-update-september-2012

gedo3

  • Jr. Member
  • **
  • Posts: 58
Re: Urban Construction Update - September 2012
« Reply #1 on: September 28, 2012, 07:15:57 AM »
I always enjoy the updates!  Thanks for keeping us current!

vicupstate

  • Hero Member
  • *****
  • Posts: 3875
Re: Urban Construction Update - September 2012
« Reply #2 on: September 28, 2012, 08:10:00 AM »
The Paul Davis project looks great.  Is it going to be apartments?

What does CoRK stand for?

"The problem with quotes on the internet is you can never be certain they're authentic." - Abraham Lincoln

Wacca Pilatka

  • Hero Member
  • *****
  • Posts: 2336
Re: Urban Construction Update - September 2012
« Reply #3 on: September 28, 2012, 08:13:28 AM »
CoRK stands for Corner of Roselle and King.
The tourist would realize at once that he had struck the Land of Flowers - the City Beautiful!

Henry J. Klutho

Noone

  • Hero Member
  • *****
  • Posts: 4061
Re: Urban Construction Update - September 2012
« Reply #4 on: September 28, 2012, 09:08:02 AM »
Glad to see the Pic of the Riverwalk connection to Bay St. New survey stakes on Hogans Creek. I've noticed dozens from Washington and Beaver all the way down to behind the Casket Factory and Jacksonville Historical Society. Hopefully there won't be demolition to habitat.

Three of us made a scene last week before the Jags game and caught about 20 fish under the brand new No Fishing Signs that was never before Waterways. Artificial Reef subcommittee meeting of the Jacksonville Waterways Commission Oct. 3. At 9:30 at city hall.
Important information for a future Urban Waterway update.

thelakelander

  • The Jaxson
  • Hero Member
  • *****
  • Posts: 35241
    • Modern Cities
Re: Urban Construction Update - September 2012
« Reply #5 on: September 28, 2012, 09:12:05 AM »
As a response to your concerns about the trees lining Hogans Creek, Miss Fixit said the survey stakes are a good thing.
"A man who views the world the same at 50 as he did at 20 has wasted 30 years of his life.” - Muhammad Ali

Doctor_K

  • Hero Member
  • *****
  • Posts: 1494
  • Your friendly neighborhood Hot Rod!
    • Carolina Fusion
Re: Urban Construction Update - September 2012
« Reply #6 on: September 28, 2012, 10:02:56 AM »
Sorry if I'm asking a dumb question - but what exactly are they doing with Robt E Lee H.S.?

Is it mostly exterior repair/restore work, or something more intense?

I don't get out that way much these days and haven't seen it in person lately...

Thanks!
"Imagination is more important than knowledge. For while knowledge defines all we currently know and understand, imagination points to all we might yet discover and create."  -- Albert Einstein

cline

  • Hero Member
  • *****
  • Posts: 1205
Re: Urban Construction Update - September 2012
« Reply #7 on: September 28, 2012, 10:13:07 AM »
They are renovating existing space and adding some new space- a new cafeteria I think.  You can read about it from the construction company site.  Supposedly it will be LEED certified which is pretty cool.

http://www.ajaxbuilding.com/current_projects_robertelee.html


Doctor_K

  • Hero Member
  • *****
  • Posts: 1494
  • Your friendly neighborhood Hot Rod!
    • Carolina Fusion
Re: Urban Construction Update - September 2012
« Reply #8 on: September 28, 2012, 11:04:16 AM »
Thanks, Cline!
"Imagination is more important than knowledge. For while knowledge defines all we currently know and understand, imagination points to all we might yet discover and create."  -- Albert Einstein

Rocshaboc

  • Newbie
  • *
  • Posts: 20
Re: Urban Construction Update - September 2012
« Reply #9 on: September 28, 2012, 12:26:41 PM »
Any idea when we'll get another tower or 2 downtown? Next 10-20 years maybe?

urbaknight

  • Hero Member
  • *****
  • Posts: 830
Re: Urban Construction Update - September 2012
« Reply #10 on: September 28, 2012, 01:00:18 PM »
^ I agree with you on that. However, I think we should fill our existing buildings first. (with apartments mostly)

ben says

  • Hero Member
  • *****
  • Posts: 2665
Re: Urban Construction Update - September 2012
« Reply #11 on: September 28, 2012, 01:02:45 PM »
Any idea wtf is going on with the new Pulp? Personally I think it's an awful move....look how fast fro-yo and smoothie businesses go dark these days. But it looks like they're stubbornly persevering. Why haven't they opened yet?

Also--any word on a potential 'town relo? What about Benham?
For luxury travel agency & concierge services, reach out at jax2bcn@gmail.com - my blog about life in Barcelona can be found at www.lifeinbarcelona.com (under construction!)

thelakelander

  • The Jaxson
  • Hero Member
  • *****
  • Posts: 35241
    • Modern Cities
Re: Urban Construction Update - September 2012
« Reply #12 on: September 28, 2012, 01:04:53 PM »
With Pulp, it could have something to do with permitting.  Nevertheless, it appears they are moving forward again.  There was construction going on when I took the image last week.
"A man who views the world the same at 50 as he did at 20 has wasted 30 years of his life.” - Muhammad Ali

urbaknight

  • Hero Member
  • *****
  • Posts: 830
Re: Urban Construction Update - September 2012
« Reply #13 on: September 28, 2012, 01:05:23 PM »
And looking at most of the sidewalks in the core, I ask myself; (and now, all of you on this site) Would it be so bad if the sidewalks went all the way to the curb? Seriously, they're only like two feet wide! And don't even get me started on the courthouse pitiful excuse for sidewalks, They don't even encompass the entire block! What backward idiot was allowed to let that design failure fly?!

simms3

  • Hero Member
  • *****
  • Posts: 3478
  • Time has come
Re: Urban Construction Update - September 2012
« Reply #14 on: September 28, 2012, 03:17:23 PM »
^^^Or how about a 6-9 ft sidewalk with inserts/planters separating pedestrians from vehicles and contributing to the overall aesthetics and feel of downtown?  Too much to ask for?  Maybe plants hanging from the lights?  Designers down there are putting in inexcusable "Julington Creek/suburbanesque" sidewalks into core areas.  Doesn't work.

Good update though (aside from that despicable VA with the prison fence around it and the sea of parking, all replacing some interesting buildings...land is just tooo cheap down there!).
Bothering locals and trolling boards since 2005